Skip to content
Doctor PC

IT services

IT infrastructure

We design and install the infrastructure the whole company runs on: structured cabling, servers, storage, backup and network equipment. All documented, so the next person who opens the rack understands what they see.

Panou de distribuție cu fibră optică într-un rack

What is included

01

Structured cabling

A network designed on plan and certified port by port. No improvisations that come back to bite you in two years.

02

Servers and virtualisation

Correct sizing, redundancy where it matters, and consolidation onto fewer physical machines.

03

Storage and backup

The 3-2-1 rule applied seriously, with periodic restore testing — an untested backup is not a backup.

04

Network equipment

Switches, routers, access points and firewalls configured for real traffic, not for the datasheet.

05

Monitoring

Alerts on temperature, disk space, availability and traffic. We find out about problems before users do.

06

Documentation

Network diagram, hardware inventory and credentials in a digital vault, handed over at project close.

How we work

We start with an audit of what exists: which devices are in place, how they are connected, where the single points of failure are. The result is a report with clear priorities — what must change now, what can wait, and what each costs.

We then design for the actual need: number of users, applications that must keep running, available budget, and how quickly you must be back at work if something fails. We install outside business hours wherever downtime is not acceptable.

What you get at the end

  • Complete network diagram and hardware inventory
  • Cabling certification, port by port
  • The restore procedure, tested in front of you
  • Training for the responsible person in your company

Frequently asked questions

01Do you work with existing infrastructure?

Yes. In most projects we do not start from scratch — we integrate what works and replace only what genuinely needs replacing. The initial audit shows exactly what stays.

02How long does a typical project take?

For a 20–40 workstation office, two to four weeks from quote approval, including hardware delivery. The cabling itself takes a few days.

03Can you work outside business hours?

Yes, and we usually recommend it for migrations and replacement of active equipment, so work does not stop.

Let's work out exactly what you need.

We look at the current situation, tell you what is worth changing and what can wait, then you get a quote with clear figures.

Request a conversation

Write us a few lines about the situation in your company and we will come back with a concrete proposal.